Bristow Industrial Park

Client:Bristow Industrial Park
Date:Dec 09, 2015

This 54 acre tract zoned M-1 (Heavy Industrial) in Gainesville, Virginia is under construction as an industrial park. The Park has an existing US Army Corps of Engineers CWA permit as well as a Virginia Stormwater Management Program.

Whit Fox representatives provided Stormwater Pollution Prevention activities including preparation of the Stormwater Pollution Prevention Plan (SWPPP), which must be prepared prior to submitting a registration statement for permit coverage to the VSMP Authority or DEQ and third-party site inspections for compliance with the general permit, including SWPPP review and periodic site-review for ongoing compliance with water quality and quantity requirements that are consistent with the VSMP permit regulations, to reduce pollutants in the stormwater runoff from the construction site.